HVAC Testing and Balancing

HVAC Testing, Adjusting and Balancing

Ensure that your HVAC system is performing as it is designed to do with our specialist air and chilled water balancing services. 

HVAC Testing and Balancing
What we offer

Our Testing and Balancing Service

Trent offers a comprehensive service for the Testing, Balancing and Commissioning of HVAC systems by qualified and experienced Engineers in accordance with BSRIA, CIBSE and ASHRAE codes of practice. Testing and Balancing involves the adjustment and balancing of HVAC components to ensure that both the Design and Specifications are met. The commissioning team work closely and in conjunction with all contractors to identify and correct any problems at the installation phase that might affect the testing and balancing.

Specialist Team

All Trent TAB specialists possess over ten years of experience inside the UAE, which allows them to easily spot and report any issues that might prevent successful commissioning.

Unparalleled Experience

Trent Team has successfully done the most prestigious projects of various types in the UAE. That includes High-rise Buildings, Museums, Healthcare Facilities, Data Centres and Secure Facilities.

Dedicated Reporting Team

Once the testing is completed, our reporting engineers always ensure that the reports are delivered on time and inspections are proceeded without the slightest delay.

Our Testing and Balancing Projects

Explore the most prestigious projects in UAE that have been tested and commissioned by Trent Technical Services Team

Louvre Abu Dhabi
Testing & Commissioning

Louvre Abu Dhabi

Testing and Commissioning of HVAC Systems in Louvre Museum Abu Dhabi

More Details
Khazna Data Center
HVAC Testing & Commissioning

Khazna Data Center Pods 1,2,3

HVAC Testings and Commissioning of both Khazna Dubai and Abu Dhabi Pods 1-3

More Details
data center
Testing & Commissioning

FAB Data Center - Kizad

HVAC Testing and Commissioning

More Details
data center
Testing & Commissioning

ICA Data Center - Khalifa City

HVAC Testing and Commissioning

More Details
Arzanah Medical Complex Healthpoint
Testing & Commissioning

Arzanah Medical Complex (Healthpoint)

HVAC Testing and Commissioning

More Details
City Walk
Testing & Commissioning

City Walk Phase II

HVAC Testing and Commissioning

More Details
Four Seasons Hotel Abu Dhabi
Testing & Commissioning

Four Seasons Hotel Abu Dhabi

Commissioning Authority for all MEP systems and hands-on testing and commissioning of HVAC System

More Details
Marina Mall Recommissioning
Re-Commissioning

Marina Mall Abu Dhabi

Verification and Re-balancing of all Air Systems in Marina Mall Abu Dhabi

More Details
IMG World of Adventure
Testing & Commissioning

IMG World of Adventure

Commissioning Authority for all MEP systems and hands-on testing and commissioning of HVAC System

More Details
W Hotel and Residence Palm Jumeira
HVAC Testing and Commissioning

W Hotel and Residence Palm Jumeira

Testing, Adjusting and Balancing of HVAC systems in W Hotel

More Details
Immigration Detention 1
Testing & Commissioning

Immigration Detention Center - Al Aweer

Commissioning Authority for all MEP systems and hands-on testing and commissioning of HVAC and Electrical System

More Details
Zayed Sports City Stadium
Testing & Commissioning

Zayed Sports City Stadium (Renovation)

MEP Commissioning Authority and hands-on testing of renovation works in the stadium

More Details

FAQ

Testing adjusting and Balancing, referred to as TAB, is the process of adjusting the flow regulating devices that controls the flowrate. That process applies to the Air side and the Chilled Water Side of an air conditioning system.

Air balancing means adjusting the volume control dampers to divert the flow and redistribute the air delivery to different diffusers.

Chilled Water Balancing means adjusting the double regulating valves or the pressure independent control valves to redistribute the chilled water flow to the different air conditioning units.

During the design of a ducted air conditioning system, each grille and diffuser is assigned a specific air flowrate that adds up to the total deliverable by the AC Unit. If one of the diffusers has more flow, the other gets less flow which accordingly causes issues with temperature and humidity in the rooms served by both diffusers.

Testing and balancing is required for any new Centralized Air Conditioning System installation to distribute the air at the specified design values which ensures a uniform temperature and humidity profile in the building.

For buildings in operation, below illustration shows issues that indicate the system requirement for Air Balancing to be performed.

Balancing

Explore

Our Other Services

Data Center Commissioning
Data Center
Commissioning

Technical management and coordination of data center commissioning process.​

Commissioning Management 1
Commissioning Management

Technical management and coordination of MEP  systems commissioning process.

Megger Testing
Electrical Testing &
Commissioning

Cold (megger) Testing and Live Testing of Electrical LV Systems and Cables.

MEP Condition Survey
MEP Condition
Survey

Condition Survey of the existing MEP Systems to achieve the best performance.​

Thermographic Survey
Electrical Thermographic Survey

Electrical Safety Thermographic Survey of electrical panels and systems.

Looking for an HVAC Testing and Balancing Company in UAE?